2026-11-20
Weekend road closures on 20–22 November: A7 in Hamburg, A12 near Utrecht and A20 in Dover

From Friday evening, the A7, including the Elbe Tunnel, two sections of the German A1 and the A99 eastern ring road around Munich will be closed. In the Netherlands, the closure of the A12 near Utrecht will continue until Tuesday morning. Disruptions will also affect the Fréjus Tunnel towards Italy, routes to the ports of Zeebrugge and Dover, and the M20 towards London.
Information as of 20 November 2026. All times are local. In the UK, the time is one hour behind Poland.
Germany
A7 in Hamburg, HH-Stellingen - HH-Heimfeld. From Friday, 20 November, at 22:00 until Monday, 23 November, at 05:00, the motorway, including the Elbe Tunnel, will be closed in both directions. Traffic will be suspended for 55 hours. The closure is due to work on traffic control systems related to the construction of the Hamburg-Hafen A7/A26 interchange.A1 between Dortmund and Münster, Dortmund/Unna - Kamen-Zentrum. Bridge demolition will result in a full motorway closure in both directions from Friday at 20:00 until Monday at 05:00. Traffic will be suspended for 57 hours.
A1 between Osnabrück and Bremen, Bramsche - Rieste. A second bridge demolition on the A1 will close both carriageways from Friday at 22:00 until Monday at 05:00. The closure will last 55 hours.
A99 on the Munich ring road, München-Ost - München-Süd. Both carriageways will be closed from Friday at 20:00 until Monday at 05:00. The 57-hour closure will allow for the demolition of the B304 road overpass and work to prepare the motorway for reopening.
A10 on Berlin's western ring road, Falkensee - Havelland interchange. The carriageway towards the Havelland interchange will be closed from Friday at 20:00 until approximately 05:00 on Monday. The reason is urgent road surface repairs.
France
Fréjus Tunnel on the A43/A32 route towards Italy. Travel from France to Italy will be suspended on the nights from Friday to Saturday and from Saturday to Sunday. Each closure will last from 22:00 to 06:00. The operator has scheduled maintenance work inside the tunnel during these periods.RN330 in Le Plessis-Belleville, level crossing No. 30. The crossing will be closed in both directions from Saturday at 06:00 until Sunday at 22:00. The 40-hour closure is due to SNCF track works. A diversion will be provided.
A13 near Paris, from the ring road to the Vaucresson interchange via the Saint-Cloud Tunnel. The closure towards Normandy has been in force since 16 November and is scheduled to continue until 31 August 2027. The reason is tunnel reinforcement work. Goods vehicles weighing more than 7.5 tonnes travelling in transit through Île-de-France must use the eastern bypass of the region via the Francilienne.
Austria
S35 in Styria, Kaltenbach and Kirchdorf tunnel section. The road will be closed in both directions from Saturday at 15:00 until Sunday at 22:00. The 31-hour closure will allow the tunnel control systems to be replaced. The local diversion runs via the L121, while the long-distance alternative route follows the A9 and the toll Gleinalm Tunnel.The Netherlands
A12 near Utrecht, Galecopperbrug bridge towards Arnhem. The main carriageway and parallel carriageway will be closed from Friday at 22:00 until Tuesday, 24 November, at 05:00. Repairs to the bridge's steel girders will prevent traffic from using this direction for 79 hours. The closure will also cover the whole of Monday.N2 near Eindhoven, De Hogt - Leenderheide towards Maastricht. The section will be closed from Friday at 21:00 until Monday at 06:00 due to asphalt resurfacing. The diversion will be signposted.
Belgium
R1 in Antwerp, at the Merksem exit towards the Netherlands. From Friday at 21:00 until Sunday at 09:30, only one lane will be available on the temporary ring road carriageway. Repairs to the bridge expansion joint will restrict capacity for more than 36 hours, and the road operator is warning of major disruption.E411/A4 between Brussels and Namur, Jezus-Eik. The motorway will be closed in both directions from Saturday at 21:00 until Sunday at 07:00 due to the construction of two bridges. A long-distance diversion via Liège, using the E42 and E40, has been designated.
A11/N31 near Bruges, Oostendse Steenweg - Blankenbergse Steenweg. The section on the route to the port of Zeebrugge will be closed in both directions from Friday at 22:00 until Saturday at 06:00. The closure is due to the removal of high-voltage power lines.
Luxembourg
No new motorway closures lasting several hours have been listed for the weekend of 20–22 November in the published schedule of the road administration.United Kingdom – Dover and Kent
A20 in Dover, Limekiln Roundabout - Lord Warden Square. A full closure in both directions is scheduled from Friday at 20:00 until Saturday at 06:00 UK time. Maintenance work will last 10 hours.M20, from junction J11 to J10a towards Ashford and London. The carriageway for traffic travelling from Dover will be closed from Friday at 20:00 until Saturday at 06:00 UK time. The reason is resurfacing work. A separate diversion has been designated for trucks because of a weight restriction on the standard diversion route.
